FANGCHENGGANG-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Guangxi Fangchenggang Nuclear Power Company, Ltd.
Guangxi Fangchenggang Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
23 Dec, 2010
29 Jun, 2016
First Grid Connection Commercial Operation Date
15 Jul, 2016
01 Oct, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
57.36 TW.h
92.8 %
89.7 %
7.2 %
89.4 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 2648.300 1000 3297 88.2 100.0 100.0 91.1 91.1
2017 6569.070 1000 6827 77.9 80.3 84.2 75.0 78.2
2018 7655.730 1000 7816 89.2 99.8 91.2 87.4 82.3
2019 7579.320 1000 7625 87.0 92.1 91.5 86.5 83.6
2020 7901.000 1000 7911 90.1 92.0 91.6 90.0 85.1
2021 8888.260 1000 8760 100.0 100.0 93.2 101.5 88.2
2022 8168.690 1000 8129 92.8 93.0 93.2 93.2 89.0
2023 8044.340 1000 8018 91.5 90.8 92.8 91.8 89.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03