NINGDE-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Fujian Ningde Nuclear Power Company, Ltd.
Fujian Ningde Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1018 MWe
1018 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
08 Jan, 2010
08 Mar, 2015
First Grid Connection Commercial Operation Date
21 Mar, 2015
10 Jun, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
68.43 TW.h
92.5 %
91.6 %
7.5 %
89.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 4638.750 1018 5586 92.8 91.2 91.2 80.9 80.9
2016 6086.410 1018 6514 74.2 81.4 85.0 68.1 72.8
2017 7971.030 1018 8107 92.6 95.6 89.1 89.4 79.2
2018 8264.160 1018 8141 92.9 92.4 90.0 92.7 83.0
2019 8167.270 1018 8075 92.2 91.6 90.4 91.6 84.8
2020 8650.700 1018 8501 96.8 96.7 91.5 96.7 87.0
2021 8418.610 1018 8271 94.4 94.4 92.0 94.4 88.1
2022 8239.000 1018 8094 92.4 92.4 92.0 92.4 88.7
2023 8595.730 1018 8451 96.5 96.4 92.5 96.4 89.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10