FUQING-5

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
HPR1000
CNNC Fujian Fuqing Nuclear Power Co., LTD
CNNC Fujian Fuqing Nuclear Power Co., LTD
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1150 MWe
3060 MWt
Construction Start Date First Criticality Date
07 May, 2015
21 Oct, 2020
First Grid Connection Commercial Operation Date
27 Nov, 2020
29 Jan, 2021

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.09 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 2020

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2020 91.720 1000 312
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2021-10-26

Previous  (FUQING-4) (FUQING-6)  Next