YANGJIANG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Yangjiang Nuclear Power Company
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1021 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
16 Dec, 2008
23 Dec, 2013
First Grid Connection Commercial Operation Date
31 Dec, 2013
25 Mar, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
79.22 TW.h
91.7 %
91.8 %
8.3 %
91.8 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2013 0.000 1000 5
2014 6793.370 1000 6753 100.0 99.9 99.9 100.5 100.5
2015 7025.370 1000 7021 80.2 79.7 88.4 80.2 88.9
2016 7077.810 1000 6989 79.6 81.5 85.9 80.6 85.9
2017 8699.830 1000 8677 99.0 99.8 89.6 99.3 89.5
2018 7715.760 1000 7789 88.9 88.2 89.3 88.1 89.2
2019 7988.460 1000 7861 89.7 89.1 89.3 91.2 89.5
2020 8122.920 1000 8665 98.6 98.4 90.6 92.5 90.0
2021 7930.660 1000 7834 89.4 88.7 90.4 90.5 90.0
2022 8373.860 1000 8312 94.9 94.2 90.8 95.6 90.7
2023 8868.110 1000 8731 99.7 99.6 91.7 101.2 91.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03