DAYA BAY-2 (Guangdong 2)

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
M310
GUANGDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED
Daya Bay Nuclear Power Operations and Management Co, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
944 MWe
930 MWe
984 MWe
2905 MWt
Construction Start Date First Criticality Date
07 Apr, 1988
21 Jan, 1994
First Grid Connection Commercial Operation Date
07 Feb, 1994
06 May, 1994

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
212.02 TW.h
86.4 %
87.8 %
13.6 %
86.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1994 5741.210 944 6889 98.0 92.3 92.3 90.3 90.3
1995 6343.330 944 7146 81.6 77.5 83.4 76.7 82.2
1996 5276.900 944 5740 65.4 63.9 76.1 63.6 75.2
1997 5914.840 944 6194 70.7 67.4 73.8 71.5 74.2
1998 6259.050 944 7302 83.4 74.7 74.0 75.7 74.5
1999 6789.460 944 7594 86.7 83.3 75.6 82.1 75.9
2000 6995.520 944 7840 89.2 88.4 77.5 84.4 77.1
2001 7355.470 944 7986 91.2 89.5 79.1 89.0 78.7
2002 6728.920 944 7224 82.5 81.6 79.4 81.4 79.0
2003 6983.050 944 7503 85.6 84.5 79.9 84.4 79.6
2004 6358.880 944 6580 74.9 74.2 79.4 76.7 79.3
2005 6586.980 944 7075 80.8 79.6 79.4 79.6 79.3
2006 8222.790 944 8760 100.0 99.9 81.0 99.4 80.9
2007 7344.170 944 7858 89.7 88.8 81.6 88.8 81.5
2008 7174.360 944 7667 87.3 86.2 81.9 86.5 81.8
2009 8222.610 944 8760 100.0 100.0 83.0 99.4 83.0
2010 7685.640 944 8197 93.6 92.5 83.6 92.9 83.6
2011 7113.120 944 7649 87.3 86.2 83.8 86.0 83.7
2012 8304.980 944 8784 100.0 99.7 84.6 100.2 84.6
2013 7091.410 944 7605 86.8 85.6 84.7 85.8 84.6
2014 6249.970 944 6629 75.7 75.2 84.2 75.6 84.2
2015 8193.180 944 8700 99.3 98.6 84.9 99.1 84.9
2016 7290.170 944 7750 88.2 87.4 85.0 87.9 85.0
2017 7376.850 944 7819 89.3 88.6 85.1 89.2 85.2
2018 8306.970 944 8739 99.8 99.6 85.7 100.4 85.8
2019 7704.070 944 8143 93.0 92.4 86.0 93.2 86.1
2020 7475.320 944 7889 89.8 89.2 86.1 90.2 86.2
2021 8321.420 944 8760 100.0 99.9 86.6 100.6 86.8
2022 7767.890 944 8209 93.7 93.2 86.8 93.9 87.0
2023 6181.830 944 6511 74.3 74.2 86.4 74.8 86.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04