SANMEN-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
AP-1000
SANMEN NUCLEAR POWER CO., LTD.
SANMEN NUCLEAR POWER CO., LTD.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1157 MWe
1157 MWe
1251 MWe
3400 MWt
Construction Start Date First Criticality Date
19 Apr, 2009
21 Jun, 2018
First Grid Connection Commercial Operation Date
30 Jun, 2018
21 Sep, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
49.15 TW.h
91.9 %
92.8 %
8.1 %
90.8 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2018 3330.630 1157 3840 100.0 99.8 99.8 99.4 99.4
2019 8987.290 1157 7909 90.3 91.1 92.9 88.7 90.8
2020 8757.820 1157 7832 89.2 87.3 90.4 86.2 88.8
2021 9379.740 1157 8268 94.4 92.9 91.2 92.6 89.9
2022 8805.200 1157 7821 89.3 88.4 90.5 86.9 89.2
2023 9887.280 1157 8667 98.9 97.6 91.9 97.6 90.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04