SANMEN-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
AP-1000
CHINA NATIONAL NUCLEAR CORPORATION
SANMEN NUCLEAR POWER CO., LTD.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1157 MWe
1157 MWe
1251 MWe
3400 MWt
Construction Start Date First Criticality Date
19 Apr, 2009
21 Jun, 2018
First Grid Connection Commercial Operation Date
30 Jun, 2018
21 Sep, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
3.33 TW.h
99.8 %
100.0 %
0.2 %
99.4 %
Lifetime performance calculated up to year 2018

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2018 3330.630 1157 3840 100.0 99.8 99.8 99.4 99.4
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2019-06-18