NINGDE-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Fujian Ningde Nuclear Power Company, Ltd.
Fujian Ningde Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1018 MWe
1018 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
12 Nov, 2008
20 Dec, 2013
First Grid Connection Commercial Operation Date
04 Jan, 2014
04 May, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
77.26 TW.h
92.5 %
91.1 %
7.5 %
88.7 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 6568.050 1018 7044 100.0 99.8 99.8 97.6 97.6
2015 6528.230 1018 7145 81.6 80.6 88.3 73.2 83.0
2016 5714.850 1018 6290 71.6 86.2 87.5 63.9 75.8
2017 8252.860 1018 8371 95.6 98.7 90.6 92.5 80.4
2018 7953.870 1018 7938 90.6 89.0 90.2 89.2 82.3
2019 8079.090 1018 8026 91.6 90.6 90.3 90.6 83.7
2020 8940.500 1018 8784 100.0 100.0 91.8 100.0 86.2
2021 8043.490 1018 7904 90.2 90.2 91.6 90.2 86.7
2022 8303.720 1018 8158 93.1 93.1 91.7 93.1 87.4
2023 8874.520 1018 8718 99.5 99.5 92.5 99.5 88.7
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-01-25


Previous  (NINGDE-1) (NINGDE-3)  Next