TIANWAN-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-428M
Jiangsu Nuclear Power Corporation
Jiangsu Nuclear Power Corporation
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1060 MWe
1060 MWe
1126 MWe
3000 MWt
Construction Start Date First Criticality Date
27 Dec, 2012
29 Sep, 2017
First Grid Connection Commercial Operation Date
30 Dec, 2017
14 Feb, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
44.66 TW.h
88.6 %
86.9 %
11.4 %
81.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2017 1.840 1060 30
2018 6922.470 1045 7704 86.8 90.8 90.8 78.8 78.8
2019 7149.360 1045 7055 80.5 81.2 85.8 78.1 78.4
2020 6896.210 1045 7611 86.6 90.7 87.5 75.1 77.3
2021 7919.120 1060 7790 88.9 92.3 88.7 85.3 79.4
2022 8757.420 1060 8709 99.4 98.9 90.8 94.3 82.4
2023 7013.260 1060 6922 79.0 78.1 88.6 75.5 81.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04