LING AO-3
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
CPR-1000
|
Lingdong Nuclear Power Company Ltd.
|
Daya Bay Nuclear Power Operations and Management Co, Ltd.
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
1007
MWe
|
1007
MWe
|
1086
MWe
|
2905
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
15 Dec, 2005
|
09 Jun, 2010
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
15 Jul, 2010
|
15 Sep, 2010
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
93.58 TW.h
|
87.8 %
|
88.5 %
|
12.2 %
|
86.1 %
|
Lifetime performance calculated up to year
2022
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
2010
|
2164.440
|
1007
|
2642
|
64.3
|
77.6
|
77.6
|
62.0
|
62.0
|
2011
|
6333.190
|
1007
|
6866
|
78.4
|
71.3
|
73.2
|
71.8
|
70.7
|
2012
|
7720.900
|
1020
|
7877
|
89.7
|
88.0
|
79.4
|
86.8
|
76.9
|
2013
|
7942.050
|
1007
|
8017
|
91.5
|
89.6
|
82.5
|
90.0
|
80.8
|
2014
|
7854.080
|
1007
|
7901
|
90.2
|
88.9
|
84.0
|
89.0
|
82.7
|
2015
|
7958.520
|
1007
|
7969
|
91.0
|
90.1
|
85.1
|
90.2
|
84.1
|
2016
|
7999.240
|
1007
|
8004
|
91.1
|
91.1
|
86.0
|
90.4
|
85.1
|
2017
|
7519.940
|
1007
|
7668
|
87.5
|
86.1
|
86.1
|
85.2
|
85.1
|
2018
|
7903.440
|
1007
|
7865
|
89.8
|
89.3
|
86.4
|
89.6
|
85.7
|
2019
|
8329.820
|
1007
|
8760
|
100.0
|
100.0
|
87.9
|
94.4
|
86.6
|
2020
|
7539.380
|
1007
|
7987
|
90.9
|
90.7
|
88.2
|
85.2
|
86.5
|
2021
|
7311.510
|
1007
|
7347
|
83.9
|
82.1
|
87.6
|
82.9
|
86.2
|
2022
|
7556.800
|
1007
|
7558
|
86.3
|
89.6
|
87.8
|
85.7
|
86.1
|
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2023-10-02