LING AO-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Lingdong Nuclear Power Company Ltd.
Daya Bay Nuclear Power Operations and Management Co, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1007 MWe
1007 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
15 Dec, 2005
09 Jun, 2010
First Grid Connection Commercial Operation Date
15 Jul, 2010
15 Sep, 2010

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
102.44 TW.h
88.7 %
89.4 %
11.3 %
87.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2010 2164.440 1007 2642 64.3 77.6 77.6 62.0 62.0
2011 6333.190 1007 6866 78.4 71.3 73.2 71.8 70.7
2012 7720.900 1020 7877 89.7 88.0 79.4 86.8 76.9
2013 7942.050 1007 8017 91.5 89.6 82.5 90.0 80.8
2014 7854.080 1007 7901 90.2 88.9 84.0 89.0 82.7
2015 7958.520 1007 7969 91.0 90.1 85.1 90.2 84.1
2016 7999.240 1007 8004 91.1 91.1 86.0 90.4 85.1
2017 7519.940 1007 7668 87.5 86.1 86.1 85.2 85.1
2018 7903.440 1007 7865 89.8 89.3 86.4 89.6 85.7
2019 8329.820 1007 8760 100.0 100.0 87.9 94.4 86.6
2020 7539.380 1007 7987 90.9 90.7 88.2 85.2 86.5
2021 7311.510 1007 7347 83.9 82.1 87.6 82.9 86.2
2022 7556.800 1007 7558 86.3 89.6 87.8 85.7 86.1
2023 8857.800 1007 8760 100.0 100.0 88.7 100.4 87.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-11-03


Previous  (LING AO-2) (LING AO-4)  Next