YANGJIANG-5

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
ACPR-1000
Yangjiang Nuclear Power Company
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1021 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
18 Sep, 2013
16 May, 2018
First Grid Connection Commercial Operation Date
23 May, 2018
12 Jul, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
42.80 TW.h
92.0 %
90.2 %
8.0 %
88.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2018 4365.350 1000 4847 97.3 99.1 99.1 94.4 94.4
2019 6699.420 1000 6927 79.1 82.4 88.0 76.5 82.5
2020 7318.680 1000 7706 87.7 94.6 90.6 83.3 82.8
2021 8195.950 1000 8314 94.9 94.4 91.7 93.6 85.9
2022 8236.090 1000 8177 93.3 92.7 91.9 94.0 87.7
2023 7988.190 1000 8088 92.3 92.2 92.0 91.2 88.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03