FUQING-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-1000
CNNC Fujian Fuqing Nuclear Power Co., LTD
CNNC Fujian Fuqing Nuclear Power Co., LTD
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
31 Dec, 2010
03 Jul, 2016
First Grid Connection Commercial Operation Date
07 Sep, 2016
24 Oct, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
50.71 TW.h
91.1 %
88.0 %
8.9 %
82.8 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 1628.310 1000 1648 100.0 100.0 100.0 98.6 98.6
2017 6110.930 1000 6592 75.2 82.1 84.7 69.8 73.9
2018 7013.400 1000 7357 84.0 88.7 86.5 80.1 76.7
2019 7390.940 1000 8107 92.6 95.2 89.3 84.4 79.2
2020 7265.420 1000 7724 87.9 88.6 89.1 82.7 80.0
2021 7184.220 1000 7835 89.4 91.0 89.5 82.0 80.4
2022 8011.270 1000 8369 95.5 99.2 91.0 91.4 82.2
2023 7576.010 1000 7792 89.0 91.4 91.1 86.5 82.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04