SANAO-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
HPR1000
CGN Cangnan Nuclear Power Co., Ltd.
CGN Cangnan Nuclear Power Co., Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1117 MWe
1208 MWe
1215 MWe
3180 MWt
Construction Start Date First Criticality Date
31 Dec, 2020
14 Feb, 2026
First Grid Connection Commercial Operation Date
12 Mar, 2026
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2024

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2026-07-17