QINSHAN 3-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
CANDU 6
Qinshan Third nuclear power Co., LTD
CNNC Nuclear Operation Management Company Limited
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
677 MWe
677 MWe
728 MWe
2064 MWt
Construction Start Date First Criticality Date
25 Sep, 1998
18 Jan, 2003
First Grid Connection Commercial Operation Date
12 Jun, 2003
24 Jul, 2003

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
107.90 TW.h
91.5 %
91.9 %
8.5 %
91.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2003 Data Not Provided
2004 5358.590 665 8236 93.8 92.4 92.4 91.7 91.7
2005 4604.650 665 7014 80.1 80.1 86.3 79.0 85.4
2006 5038.170 650 7721 88.1 86.7 86.4 88.5 86.4
2007 5675.700 650 8559 97.7 97.6 89.2 99.7 89.7
2008 5083.410 650 7697 87.6 87.2 88.8 89.0 89.6
2009 5523.740 650 8359 95.4 95.4 89.9 97.0 90.8
2010 5341.460 650 8099 92.4 92.1 90.2 93.8 91.2
2011 5261.090 650 7951 90.8 90.3 90.2 92.4 91.4
2012 5210.750 650 7980 90.8 90.4 90.2 91.3 91.4
2013 5794.090 650 8760 100.0 99.8 91.2 101.8 92.4
2014 5223.320 650 7892 90.1 90.0 91.1 91.7 92.3
2015 5623.820 677 8553 97.6 97.3 91.6 94.8 92.5
2016 4555.030 677 6979 79.4 79.3 90.6 76.6 91.3
2017 5598.620 677 8580 98.0 98.2 91.2 94.4 91.5
2018 4685.150 677 7183 82.0 81.6 90.5 79.0 90.6
2019 5716.870 677 8686 99.2 98.0 91.0 96.4 91.0
2020 5261.050 677 8014 91.2 91.0 91.0 88.5 90.9
2021 5607.860 677 8540 97.5 98.6 91.4 94.6 91.1
2022 4979.490 677 7573 86.4 84.6 91.1 84.0 90.7
2023 5737.330 677 8760 100.0 98.6 91.5 96.7 91.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (QINSHAN 3-1) (QINSHAN-1)  Next