HONGYANHE-2
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
CPR-1000
|
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
|
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
1061
MWe
|
1061
MWe
|
1119
MWe
|
2905
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
28 Mar, 2008
|
24 Oct, 2013
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
23 Nov, 2013
|
13 May, 2014
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
68.42 TW.h
|
87.8 %
|
81.6 %
|
12.2 %
|
75.5 %
|
Lifetime performance calculated up to year
2023
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
2013
|
82.000
|
1061
|
340
|
|
|
|
|
|
2014
|
4963.310
|
1061
|
5053
|
79.8
|
81.1
|
81.1
|
72.5
|
72.5
|
2015
|
3496.010
|
1061
|
3925
|
44.8
|
65.6
|
71.8
|
37.6
|
51.6
|
2016
|
5288.780
|
1061
|
5542
|
63.1
|
87.5
|
77.7
|
56.8
|
53.5
|
2017
|
5790.370
|
1061
|
6250
|
71.4
|
96.0
|
82.7
|
62.3
|
55.9
|
2018
|
7737.780
|
1061
|
7723
|
88.2
|
88.2
|
83.9
|
83.2
|
61.8
|
2019
|
8077.340
|
1061
|
8056
|
92.0
|
89.7
|
84.9
|
86.9
|
66.2
|
2020
|
7767.350
|
1061
|
8018
|
91.3
|
89.3
|
85.6
|
83.3
|
68.8
|
2021
|
8195.340
|
1061
|
8027
|
91.6
|
89.4
|
86.1
|
88.2
|
71.3
|
2022
|
8882.060
|
1061
|
8760
|
100.0
|
98.0
|
87.4
|
95.6
|
74.1
|
2023
|
8143.390
|
1061
|
8140
|
92.9
|
90.5
|
87.8
|
87.6
|
75.5
|
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-10