XIAPU-2

Under Construction


Reactor Details

Reactor Type Model Owner Operator
FBR
CFR600
CNNC Longyuan Technology Co. , Ltd
CHINA NATIONAL NUCLEAR CORPORATION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
642 MWe
642 MWe
682 MWe
1882 MWt
Construction Start Date First Criticality Date
27 Dec, 2020
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (XIAPU-1) (XUDAPU-1)  Next