QINSHAN 2-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
CNNC Nuclear Operation Management Company Limited
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
623 MWe
619 MWe
660 MWe
1930 MWt
Construction Start Date First Criticality Date
28 Apr, 2006
13 Jul, 2010
First Grid Connection Commercial Operation Date
01 Aug, 2010
05 Oct, 2010

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
65.54 TW.h
91.6 %
91.8 %
8.4 %
91.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2010 1465.170 610 2685 96.3 92.1 92.1 94.8 94.8
2011 4434.130 610 7226 82.5 81.6 84.2 83.0 85.7
2012 4846.780 610 7977 90.8 90.0 86.8 90.4 87.8
2013 5076.150 610 8243 94.1 93.5 88.8 95.0 90.0
2014 4929.310 619 8078 92.2 92.0 89.6 90.9 90.2
2015 4519.980 619 7410 84.6 86.2 88.9 83.4 88.9
2016 5259.450 619 8584 97.7 99.8 90.7 96.7 90.2
2017 4768.410 619 7804 89.1 88.0 90.3 87.9 89.9
2018 4767.330 619 7756 88.5 87.9 90.0 87.9 89.6
2019 5341.240 619 8664 98.9 98.8 91.0 98.5 90.6
2020 4753.880 619 7870 89.6 90.0 90.9 87.4 90.3
2021 4788.170 619 7768 88.7 88.2 90.6 88.3 90.1
2022 5468.090 619 8760 100.0 99.7 91.4 100.8 91.0
2023 5184.380 623 8397 95.9 94.9 91.6 95.0 91.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18