HONGYANHE-1
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
CPR-1000
|
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
|
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
1061
MWe
|
1061
MWe
|
1119
MWe
|
2905
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
18 Aug, 2007
|
16 Jan, 2013
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
17 Feb, 2013
|
06 Jun, 2013
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
73.98 TW.h
|
89.1 %
|
88.9 %
|
10.9 %
|
82.8 %
|
Lifetime performance calculated up to year
2022
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
2013
|
5683.380
|
1061
|
7632
|
100.0
|
98.6
|
98.6
|
102.4
|
102.4
|
2014
|
6093.200
|
1061
|
6218
|
71.0
|
68.4
|
79.6
|
65.6
|
79.2
|
2015
|
7369.750
|
1061
|
7756
|
88.5
|
87.8
|
82.7
|
79.3
|
79.2
|
2016
|
6066.040
|
1061
|
6694
|
76.2
|
86.6
|
83.8
|
65.1
|
75.3
|
2017
|
7304.120
|
1061
|
7720
|
88.1
|
87.9
|
84.7
|
78.6
|
76.0
|
2018
|
8797.860
|
1061
|
8760
|
100.0
|
98.6
|
87.2
|
94.7
|
79.3
|
2019
|
8077.710
|
1061
|
7954
|
90.8
|
88.5
|
87.4
|
86.9
|
80.5
|
2020
|
7903.950
|
1061
|
8033
|
91.4
|
89.6
|
87.7
|
84.8
|
81.1
|
2021
|
8980.890
|
1061
|
8760
|
100.0
|
98.2
|
88.9
|
96.6
|
82.9
|
2022
|
7605.000
|
1061
|
7696
|
87.8
|
90.6
|
89.1
|
81.8
|
82.8
|
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2023-06-04