LING AO-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
M310
LINGAO NUCLEAR POWER COMPANY LTD.
Daya Bay Nuclear Power Operations and Management Co, Ltd.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
950
MW
e
950
MW
e
990
MW
e
2905
MW
t
Construction Start Date
First Criticality Date
15 May, 1997
04 Feb, 2002
First Grid Connection
Commercial Operation Date
26 Feb, 2002
28 May, 2002
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
158.09 TW.h
89.7 %
90.6 %
10.3 %
88.2 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2002
4583.850
938
5184
99.5
95.1
95.1
93.5
93.5
2003
6375.050
938
7215
82.4
80.4
85.8
77.6
83.5
2004
7331.360
938
7884
89.8
88.7
86.9
89.0
85.6
2005
6906.430
938
7424
84.8
84.3
86.2
84.0
85.2
2006
7401.010
938
7964
90.9
90.1
87.0
90.1
86.2
2007
6835.040
938
7345
83.8
83.2
86.4
83.2
85.7
2008
7542.850
938
8163
92.9
91.2
87.1
91.6
86.6
2009
7002.520
938
7997
91.3
90.4
87.5
85.2
86.4
2010
7714.570
938
8288
94.6
93.6
88.2
93.9
87.3
2011
7571.370
938
8072
92.2
91.2
88.5
92.1
87.8
2012
7657.290
938
8286
94.3
93.4
89.0
92.9
88.3
2013
6841.690
950
7340
83.8
82.5
88.4
82.3
87.8
2014
7361.900
950
7899
90.2
89.4
88.5
88.5
87.8
2015
7180.100
950
7656
87.4
86.8
88.4
86.3
87.7
2016
8253.130
950
8784
100.0
99.7
89.2
98.9
88.5
2017
7020.490
950
7538
86.0
88.6
89.1
84.4
88.2
2018
6990.810
950
7667
87.5
86.5
89.0
84.0
88.0
2019
7518.480
950
8363
95.5
94.7
89.3
90.3
88.1
2020
7556.540
950
8784
100.0
100.0
89.9
90.6
88.2
2021
7441.920
950
7896
90.1
89.4
89.8
89.4
88.3
2022
6706.960
950
7226
82.5
82.0
89.5
80.6
87.9
2023
7899.060
950
8428
96.2
95.5
89.7
94.9
88.2
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(LIANJIANG-2)
(LING AO-2)
Next
CHINA
CHANGJIANG-1
CHANGJIANG-2
CHANGJIANG-3
CHANGJIANG-4
DAYA BAY-1
DAYA BAY-2
FANGCHENGGANG-1
FANGCHENGGANG-2
FANGCHENGGANG-3
FANGCHENGGANG-4
FANGJIASHAN-1
FANGJIASHAN-2
FUQING-1
FUQING-2
FUQING-3
FUQING-4
FUQING-5
FUQING-6
HAIYANG-1
HAIYANG-2
HAIYANG-3
HAIYANG-4
HONGYANHE-1
HONGYANHE-2
HONGYANHE-3
HONGYANHE-4
HONGYANHE-5
HONGYANHE-6
LIANJIANG-1
LIANJIANG-2
LING AO-1
LING AO-2
LING AO-3
LING AO-4
LINGLONG-1
LUFENG-5
LUFENG-6
NINGDE-1
NINGDE-2
NINGDE-3
NINGDE-4
NINGDE-5
QINSHAN 2-1
QINSHAN 2-2
QINSHAN 2-3
QINSHAN 2-4
QINSHAN 3-1
QINSHAN 3-2
QINSHAN-1
SANAO-1
SANAO-2
SANMEN-1
SANMEN-2
SANMEN-3
SANMEN-4
SHIDAO BAY-1
SHIDAOWAN-1
TAIPINGLING-1
TAIPINGLING-2
TAISHAN-1
TAISHAN-2
TIANWAN-1
TIANWAN-2
TIANWAN-3
TIANWAN-4
TIANWAN-5
TIANWAN-6
TIANWAN-7
TIANWAN-8
XIAPU-1
XIAPU-2
XUDAPU-1
XUDAPU-2
XUDAPU-3
XUDAPU-4
YANGJIANG-1
YANGJIANG-2
YANGJIANG-3
YANGJIANG-4
YANGJIANG-5
YANGJIANG-6
ZHANGZHOU-1
ZHANGZHOU-2
ZHANGZHOU-3