HONGYANHE-5

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
ACPR-1000
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1061 MWe
1061 MWe
1119 MWe
2905 MWt
Construction Start Date First Criticality Date
29 Mar, 2015
13 Jun, 2021
First Grid Connection Commercial Operation Date
25 Jun, 2021
31 Jul, 2021

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
18.34 TW.h
93.5 %
87.3 %
6.5 %
81.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2021 4718.480 1061 4560 100.0 97.7 97.7 96.9 96.9
2022 6217.300 1061 6490 74.1 87.3 90.4 66.9 75.8
2023 8347.900 1061 8340 95.2 97.9 93.5 89.8 81.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-03-22


Previous  (HONGYANHE-4) (HONGYANHE-6)  Next