CHANGJIANG-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
CHINA NATIONAL NUCLEAR CORPORATION
Hainan Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
601 MWe
601 MWe
650 MWe
1930 MWt
Construction Start Date First Criticality Date
21 Nov, 2010
09 Jun, 2016
First Grid Connection Commercial Operation Date
20 Jun, 2016
12 Aug, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
31.73 TW.h
90.6 %
90.0 %
9.4 %
80.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 1831.250 601 4180 95.9 95.3 95.3 73.0 73.0
2017 3417.220 601 7524 85.9 88.4 90.5 64.9 67.3
2018 3239.860 601 6531 74.6 74.5 83.9 61.5 64.9
2019 4641.870 601 8483 96.8 96.2 87.5 88.2 71.7
2020 4328.280 601 7689 87.5 92.1 88.5 82.0 74.0
2021 4572.650 601 8147 93.0 92.0 89.2 86.8 76.4
2022 4587.190 601 7882 90.0 89.7 89.2 87.1 78.1
2023 5110.990 601 8760 100.0 99.1 90.6 97.1 80.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03