YANGJIANG-6

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
ACPR-1000
Yangjiang Nuclear Power Company
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
23 Dec, 2013
22 Jun, 2019
First Grid Connection Commercial Operation Date
29 Jun, 2019
24 Jul, 2019

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
34.78 TW.h
92.3 %
89.7 %
7.7 %
88.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2019 3934.180 1000 3915 93.2 100.0 100.0 92.8 92.8
2020 5896.660 1000 6526 74.3 82.4 87.6 67.1 74.7
2021 8522.450 1000 8571 97.8 99.3 92.4 97.3 84.0
2022 8349.540 1000 8234 94.0 93.6 92.8 95.3 87.3
2023 8015.330 1000 7990 91.2 90.9 92.3 91.5 88.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04