NINGDE-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Fujian Ningde Nuclear Power Company, Ltd.
Fujian Ningde Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1018 MWe
1018 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
29 Sep, 2010
16 Mar, 2016
First Grid Connection Commercial Operation Date
29 Mar, 2016
21 Jul, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
59.00 TW.h
92.6 %
90.3 %
7.4 %
88.7 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 3694.870 1018 3786 95.9 99.9 99.9 91.8 91.8
2017 5303.770 1018 5739 65.5 84.3 88.9 59.5 69.0
2018 8917.080 1018 8760 100.0 100.0 93.5 100.0 81.8
2019 8074.330 1018 7992 91.2 90.5 92.6 90.5 84.4
2020 7998.170 1018 8033 91.4 89.4 91.9 89.4 85.5
2021 8916.450 1018 8760 100.0 100.0 93.4 100.0 88.2
2022 8126.580 1018 7984 91.1 91.1 93.0 91.1 88.6
2023 7967.670 1018 7914 90.3 89.4 92.6 89.4 88.7
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03