FANGJIASHAN-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
QINSHAN NUCLEAR POWER COMPANY
CNNC Nuclear Operation Management Company Limited
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1012 MWe
1000 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
17 Jul, 2009
25 Dec, 2014
First Grid Connection Commercial Operation Date
12 Jan, 2015
12 Feb, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
71.80 TW.h
92.3 %
92.2 %
7.7 %
90.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 7400.550 1012 7747 92.9 93.2 93.2 90.0 90.0
2016 7324.840 1012 7529 85.7 87.3 90.1 82.4 86.0
2017 7521.750 1012 7563 86.3 85.0 88.4 84.8 85.6
2018 8472.420 1012 8483 96.8 97.6 90.7 95.6 88.2
2019 7965.850 1012 7963 90.9 91.0 90.8 89.9 88.5
2020 8418.730 1012 8376 95.4 99.6 92.3 94.7 89.6
2021 7663.470 1012 7704 88.0 85.8 91.3 86.4 89.1
2022 8301.130 1012 8219 93.8 92.2 91.4 93.6 89.7
2023 8882.440 1012 8760 100.0 99.0 92.3 100.2 90.9
Performance indicators are calculated from the Commercial Operation Date.