FUQING-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-1000
CNNC Fujian Fuqing Nuclear Power Co., LTD
CNNC Fujian Fuqing Nuclear Power Co., LTD
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
17 Nov, 2012
16 Jul, 2017
First Grid Connection Commercial Operation Date
29 Jul, 2017
17 Sep, 2017

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
44.17 TW.h
86.6 %
82.7 %
13.4 %
80.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2017 2540.070 1000 2544 100.0 100.0 100.0 100.0 100.0
2018 6682.090 1000 6890 78.6 77.8 82.3 76.3 81.0
2019 6599.790 1000 7215 82.4 91.3 86.3 75.3 78.5
2020 6587.820 1000 6953 79.2 92.0 88.0 75.0 77.4
2021 8297.780 1000 8407 96.0 99.4 90.7 94.7 81.5
2022 7799.960 1000 7904 90.2 89.0 90.4 89.0 82.9
2023 5665.020 1000 5729 65.4 66.8 86.6 64.7 80.0
Performance indicators are calculated from the Commercial Operation Date.