LING AO-4
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
CPR-1000
|
Lingdong Nuclear Power Company Ltd.
|
Daya Bay Nuclear Power Operations and Management Co, Ltd.
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
1007
MWe
|
1007
MWe
|
1086
MWe
|
2905
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
15 Jun, 2006
|
25 Feb, 2011
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
03 May, 2011
|
07 Aug, 2011
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
88.03 TW.h
|
90.3 %
|
89.8 %
|
9.7 %
|
87.2 %
|
Lifetime performance calculated up to year
2022
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
2011
|
3914.720
|
1007
|
5268
|
100.0
|
99.6
|
99.6
|
96.0
|
96.0
|
2012
|
7009.720
|
1020
|
7156
|
81.5
|
80.1
|
85.8
|
78.2
|
83.4
|
2013
|
7870.250
|
1007
|
7880
|
90.0
|
88.4
|
86.9
|
89.2
|
85.8
|
2014
|
7895.970
|
1007
|
7972
|
91.0
|
89.8
|
87.7
|
89.5
|
86.9
|
2015
|
7916.590
|
1007
|
7963
|
90.9
|
90.3
|
88.3
|
89.7
|
87.5
|
2016
|
7211.420
|
1007
|
7329
|
83.4
|
87.6
|
88.2
|
81.5
|
86.4
|
2017
|
7677.260
|
1007
|
7668
|
87.5
|
91.2
|
88.6
|
87.0
|
86.5
|
2018
|
8207.810
|
1007
|
8447
|
96.4
|
97.9
|
89.9
|
93.0
|
87.4
|
2019
|
7157.300
|
1007
|
7588
|
86.6
|
88.8
|
89.8
|
81.1
|
86.6
|
2020
|
7333.580
|
1007
|
8185
|
93.2
|
92.8
|
90.1
|
82.9
|
86.2
|
2021
|
7366.900
|
1007
|
7331
|
83.7
|
82.6
|
89.4
|
83.5
|
86.0
|
2022
|
8841.240
|
1007
|
8744
|
99.8
|
99.8
|
90.3
|
100.2
|
87.2
|
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2023-06-06