LING AO-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Lingdong Nuclear Power Company Ltd.
Daya Bay Nuclear Power Operations and Management Co, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1007 MWe
1007 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
15 Jun, 2006
25 Feb, 2011
First Grid Connection Commercial Operation Date
03 May, 2011
07 Aug, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
96.30 TW.h
90.5 %
90.2 %
9.5 %
87.8 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 3914.720 1007 5268 100.0 99.6 99.6 96.0 96.0
2012 7009.720 1020 7156 81.5 80.1 85.8 78.2 83.4
2013 7870.250 1007 7880 90.0 88.4 86.9 89.2 85.8
2014 7895.970 1007 7972 91.0 89.8 87.7 89.5 86.9
2015 7916.590 1007 7963 90.9 90.3 88.3 89.7 87.5
2016 7211.420 1007 7329 83.4 87.6 88.2 81.5 86.4
2017 7677.260 1007 7668 87.5 91.2 88.6 87.0 86.5
2018 8207.810 1007 8447 96.4 97.9 89.9 93.0 87.4
2019 7157.300 1007 7588 86.6 88.8 89.8 81.1 86.6
2020 7333.580 1007 8185 93.2 92.8 90.1 82.9 86.2
2021 7366.900 1007 7331 83.7 82.6 89.4 83.5 86.0
2022 8841.240 1007 8744 99.8 99.8 90.3 100.2 87.2
2023 8260.890 1007 8229 93.9 93.2 90.5 93.6 87.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03