CHANGJIANG-3

Under Construction


Reactor Details

Reactor Type Model Owner Operator
PWR
Hualong One
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
610 MWe
610 MWe
650 MWe
1930 MWt
Construction Start Date First Criticality Date
31 Mar, 2021
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data generated by the PRIS database. Last update on 2021-05-13

Previous  (CHANGJIANG-2) (DAYA BAY-1)  Next