QINSHAN 2-4
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
CNP-600
|
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
|
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
619
MWe
|
619
MWe
|
660
MWe
|
1930
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
28 Jan, 2007
|
17 Nov, 2011
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
25 Nov, 2011
|
30 Dec, 2011
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
54.18 TW.h
|
90.9 %
|
91.3 %
|
9.1 %
|
90.9 %
|
Lifetime performance calculated up to year
2022
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
2011
|
257.020
|
610
|
614
|
|
|
|
|
|
2012
|
5195.810
|
610
|
8438
|
96.1
|
95.8
|
95.8
|
97.0
|
97.0
|
2013
|
4591.390
|
610
|
7428
|
84.8
|
84.2
|
90.0
|
85.9
|
91.4
|
2014
|
4844.490
|
610
|
7905
|
90.2
|
88.9
|
89.6
|
90.7
|
91.2
|
2015
|
4837.340
|
610
|
7994
|
91.3
|
91.1
|
90.0
|
90.5
|
91.0
|
2016
|
4983.820
|
610
|
8130
|
92.6
|
91.9
|
90.4
|
93.0
|
91.4
|
2017
|
4899.450
|
619
|
7993
|
91.2
|
90.1
|
90.3
|
90.4
|
91.2
|
2018
|
4786.770
|
619
|
7760
|
88.6
|
88.2
|
90.0
|
88.3
|
90.8
|
2019
|
4812.210
|
619
|
7815
|
89.2
|
91.9
|
90.3
|
88.8
|
90.6
|
2020
|
5276.680
|
619
|
8784
|
100.0
|
100.0
|
91.4
|
97.0
|
91.3
|
2021
|
4882.830
|
619
|
7898
|
90.2
|
89.0
|
91.1
|
90.0
|
91.2
|
2022
|
4812.100
|
619
|
7861
|
89.7
|
88.8
|
90.9
|
88.7
|
90.9
|
Performance indicators are calculated from the Commercial Operation Date.