QINSHAN 2-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
CNNC Nuclear Operation Management Company Limited
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
623 MWe
619 MWe
660 MWe
1930 MWt
Construction Start Date First Criticality Date
28 Jan, 2007
17 Nov, 2011
First Grid Connection Commercial Operation Date
25 Nov, 2011
30 Dec, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
59.58 TW.h
91.6 %
92.0 %
8.4 %
91.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 257.020 610 614
2012 5195.810 610 8438 96.1 95.8 95.8 97.0 97.0
2013 4591.390 610 7428 84.8 84.2 90.0 85.9 91.4
2014 4844.490 610 7905 90.2 88.9 89.6 90.7 91.2
2015 4837.340 610 7994 91.3 91.1 90.0 90.5 91.0
2016 4983.820 610 8130 92.6 91.9 90.4 93.0 91.4
2017 4899.450 619 7993 91.2 90.1 90.3 90.4 91.2
2018 4786.770 619 7760 88.6 88.2 90.0 88.3 90.8
2019 4812.210 619 7815 89.2 91.9 90.3 88.8 90.6
2020 5276.680 619 8784 100.0 100.0 91.4 97.0 91.3
2021 4882.830 619 7898 90.2 89.0 91.1 90.0 91.2
2022 4812.100 619 7861 89.7 88.8 90.9 88.7 90.9
2023 5419.730 623 8760 100.0 99.4 91.6 99.3 91.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18