YANGJIANG-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Yangjiang Nuclear Power Company
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
04 Jun, 2009
02 Mar, 2015
First Grid Connection Commercial Operation Date
10 Mar, 2015
05 Jun, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
68.07 TW.h
91.8 %
90.5 %
8.2 %
89.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 5683.720 1000 6017 100.0 99.8 99.8 102.2 102.2
2016 6911.710 1000 6874 78.3 77.6 85.8 78.7 87.4
2017 7497.380 1000 7476 85.3 88.0 86.6 85.6 86.7
2018 8910.120 1000 8760 100.0 100.0 90.3 101.7 90.9
2019 7478.070 1000 7943 90.7 90.0 90.3 85.4 89.7
2020 6539.670 1000 6854 78.0 88.5 89.9 74.4 86.9
2021 8783.890 1000 8760 100.0 100.0 91.5 100.3 89.0
2022 8156.580 1000 8077 92.2 91.8 91.5 93.1 89.5
2023 8111.960 1000 8225 93.9 93.9 91.8 92.6 89.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-03-22