FUQING-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-1000
CNNC Fujian Fuqing Nuclear Power Co., LTD
CNNC Fujian Fuqing Nuclear Power Co., LTD
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
21 Nov, 2008
24 Jul, 2014
First Grid Connection Commercial Operation Date
20 Aug, 2014
22 Nov, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
67.94 TW.h
91.1 %
89.3 %
8.9 %
85.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 1033.070 1000 949 100.0 100.0 100.0 109.0 109.0
2015 6032.380 1000 6514 74.4 74.1 76.1 68.9 72.0
2016 6662.040 1000 7511 85.5 99.3 87.3 75.8 73.8
2017 7535.410 1000 7930 90.5 89.8 88.1 86.0 77.8
2018 7398.980 1000 7702 87.9 86.6 87.7 84.5 79.4
2019 6417.640 1000 7072 80.7 88.6 87.9 73.3 78.2
2020 8222.850 1000 8706 99.1 98.6 89.7 93.6 80.8
2021 7967.880 1000 8166 93.2 92.0 90.0 91.0 82.2
2022 7927.140 1000 8001 91.3 90.3 90.0 90.5 83.2
2023 8746.940 1000 8760 100.0 99.6 91.1 99.8 85.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03