FANGCHENGGANG-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
HPR1000
Guangxi Fangchenggang Nuclear Power Company, Ltd.
Guangxi Fangchenggang Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1180 MWe
3150 MWt
Construction Start Date First Criticality Date
24 Dec, 2015
27 Dec, 2022
First Grid Connection Commercial Operation Date
10 Jan, 2023
25 Mar, 2023

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
7.22 TW.h
98.2 %
98.2 %
1.8 %
106.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2023 7569.940 1000 6641 98.2 98.2 98.2 106.6 106.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04