HONGYANHE-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1061 MWe
1061 MWe
1119 MWe
2905 MWt
Construction Start Date First Criticality Date
15 Aug, 2009
05 Mar, 2016
First Grid Connection Commercial Operation Date
01 Apr, 2016
08 Jun, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
49.29 TW.h
89.3 %
74.2 %
10.7 %
69.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 1130.440 1000 1200 54.4 100.0 100.0 51.2 51.2
2017 3276.060 1061 3638 41.5 85.1 90.4 35.2 30.5
2018 5198.530 1061 5361 61.2 84.1 87.9 55.9 40.5
2019 7117.140 1061 7035 80.3 90.4 88.6 76.6 50.6
2020 7755.390 1061 8183 93.2 91.3 89.2 83.2 57.8
2021 8327.550 1061 8177 93.3 91.2 89.6 89.6 63.5
2022 8000.100 1061 8076 92.2 89.5 89.6 86.1 67.0
2023 7771.550 1061 7655 87.4 87.4 89.3 83.6 69.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04