TIANWAN-5

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-1000
Jiangsu Nuclear Power Corporation
Jiangsu Nuclear Power Corporation
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1060 MWe
1000 MWe
1118 MWe
2905 MWt
Construction Start Date First Criticality Date
27 Dec, 2015
27 Jul, 2020
First Grid Connection Commercial Operation Date
08 Aug, 2020
08 Sep, 2020

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
27.41 TW.h
91.6 %
91.9 %
8.4 %
88.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2020 2901.910 1000 3383 95.9 93.3 93.3 91.3 91.3
2021 7538.340 1060 7400 84.5 84.4 86.5 81.2 83.6
2022 8933.220 1060 8760 100.0 98.4 91.6 96.2 89.0
2023 8038.070 1060 7864 89.8 91.5 91.6 86.6 88.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04