SANMEN-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
AP-1000
SANMEN NUCLEAR POWER CO., LTD.
SANMEN NUCLEAR POWER CO., LTD.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1157 MWe
1157 MWe
1251 MWe
3400 MWt
Construction Start Date First Criticality Date
15 Dec, 2009
17 Aug, 2018
First Grid Connection Commercial Operation Date
24 Aug, 2018
05 Nov, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
39.58 TW.h
76.1 %
75.6 %
23.9 %
74.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2018 2252.770 1157 2381 85.2 85.1 85.1 85.8 85.8
2019 905.960 1157 817 9.3 8.9 19.8 8.9 20.0
2020 8786.180 1157 7871 89.6 97.2 55.6 86.4 50.7
2021 9140.140 1157 8085 92.3 90.2 66.5 90.2 63.1
2022 9254.090 1157 8087 92.3 91.3 72.5 91.3 69.9
2023 9240.770 1157 8110 92.6 91.2 76.1 91.2 74.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (SANMEN-1) (SANMEN-3)  Next