HONGYANHE-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1061 MWe
1061 MWe
1119 MWe
2905 MWt
Construction Start Date First Criticality Date
07 Mar, 2009
27 Oct, 2014
First Grid Connection Commercial Operation Date
23 Mar, 2015
16 Aug, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
57.55 TW.h
89.3 %
78.8 %
10.7 %
73.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 2322.530 1061 2835 48.0 100.0 100.0 43.2 43.2
2016 5483.990 1061 5764 65.6 94.7 96.0 58.8 54.9
2017 5631.500 1061 5975 68.2 80.9 89.6 60.6 57.4
2018 6535.980 1061 6697 76.4 89.7 89.6 70.3 61.2
2019 7491.340 1061 7481 85.4 82.7 88.0 80.6 65.7
2020 6938.560 1061 7116 81.0 98.0 89.9 74.4 67.4
2021 7943.870 1061 7670 87.6 85.8 89.2 85.5 70.2
2022 7198.110 1061 7472 85.3 89.7 89.3 77.4 71.2
2023 8025.660 1061 7996 91.3 88.8 89.3 86.4 73.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10

Previous  (HONGYANHE-2) (HONGYANHE-4)  Next