QINSHAN 2-2
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
CNP-600
|
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
|
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
610
MWe
|
610
MWe
|
650
MWe
|
1930
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
01 Apr, 1997
|
25 Feb, 2004
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
11 Mar, 2004
|
03 May, 2004
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
90.24 TW.h
|
89.1 %
|
89.6 %
|
10.9 %
|
90.2 %
|
Lifetime performance calculated up to year
2022
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
2004
|
3764.390
|
610
|
6381
|
96.6
|
96.2
|
96.2
|
98.0
|
98.0
|
2005
|
4521.510
|
610
|
7331
|
83.7
|
82.7
|
88.1
|
84.6
|
90.0
|
2006
|
4790.440
|
610
|
7822
|
89.3
|
88.8
|
88.4
|
89.6
|
89.8
|
2007
|
4817.010
|
610
|
7792
|
89.0
|
88.3
|
88.4
|
90.2
|
89.9
|
2008
|
4635.510
|
610
|
7545
|
85.9
|
84.9
|
87.6
|
86.5
|
89.2
|
2009
|
4787.800
|
610
|
7821
|
89.3
|
88.2
|
87.7
|
89.6
|
89.3
|
2010
|
4715.040
|
610
|
7645
|
87.3
|
86.6
|
87.6
|
88.2
|
89.1
|
2011
|
4960.230
|
610
|
8014
|
91.5
|
90.9
|
88.0
|
92.8
|
89.6
|
2012
|
4335.540
|
610
|
7072
|
80.5
|
79.6
|
87.0
|
80.9
|
88.6
|
2013
|
4818.510
|
610
|
7826
|
89.3
|
88.7
|
87.2
|
90.2
|
88.8
|
2014
|
4626.250
|
610
|
7514
|
85.8
|
85.0
|
87.0
|
86.6
|
88.6
|
2015
|
4872.990
|
610
|
7990
|
91.2
|
95.1
|
87.7
|
91.2
|
88.8
|
2016
|
4525.570
|
610
|
7377
|
84.0
|
83.8
|
87.4
|
84.5
|
88.4
|
2017
|
4803.390
|
610
|
7830
|
89.4
|
88.8
|
87.5
|
89.9
|
88.5
|
2018
|
5306.280
|
610
|
8574
|
97.9
|
97.6
|
88.2
|
99.3
|
89.3
|
2019
|
4735.260
|
610
|
7680
|
87.7
|
87.1
|
88.1
|
88.6
|
89.2
|
2020
|
4758.460
|
610
|
8156
|
92.8
|
90.8
|
88.3
|
88.8
|
89.2
|
2021
|
5406.390
|
610
|
8760
|
100.0
|
99.9
|
88.9
|
101.2
|
89.9
|
2022
|
5064.370
|
610
|
8159
|
93.1
|
92.8
|
89.1
|
94.8
|
90.2
|
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2023-06-06