YANGJIANG-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Yangjiang Nuclear Power Company
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
15 Nov, 2010
11 Oct, 2015
First Grid Connection Commercial Operation Date
18 Oct, 2015
01 Jan, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
63.49 TW.h
92.6 %
90.8 %
7.4 %
89.8 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 478.680 1000 890
2016 7593.850 1000 7559 86.0 91.1 91.1 86.4 86.4
2017 7396.070 1000 7435 84.9 86.1 88.6 84.4 85.4
2018 7926.660 1000 8028 91.6 91.1 89.4 90.5 87.1
2019 8621.670 1000 8760 100.0 100.0 92.1 98.4 89.9
2020 6600.210 1000 7039 80.1 86.8 91.0 75.1 87.0
2021 7804.980 1000 7978 91.1 93.4 91.4 89.1 87.3
2022 8991.990 1000 8760 100.0 100.0 92.6 102.6 89.5
2023 8071.110 1000 8087 92.3 91.9 92.6 92.1 89.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10

Previous  (YANGJIANG-2) (YANGJIANG-4)  Next