CHANGJIANG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
Hainan Nuclear Power Company
Hainan Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
601 MWe
601 MWe
650 MWe
1930 MWt
Construction Start Date First Criticality Date
25 Apr, 2010
12 Oct, 2015
First Grid Connection Commercial Operation Date
07 Nov, 2015
25 Dec, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
34.16 TW.h
90.4 %
90.4 %
9.6 %
81.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 43.730 610 1006
2016 3617.230 601 8185 93.2 94.0 94.0 68.5 68.5
2017 3405.190 601 7006 80.0 80.0 87.0 64.7 66.6
2018 3909.290 601 7711 88.0 87.5 87.2 74.2 69.2
2019 4352.300 601 7741 88.4 87.5 87.2 82.7 72.5
2020 4519.050 601 7933 90.3 91.5 88.1 85.9 75.2
2021 4467.670 601 8044 91.8 92.6 88.8 84.9 76.8
2022 5195.390 601 8760 100.0 99.9 90.4 98.7 79.9
2023 4645.340 601 7992 91.2 90.5 90.4 88.2 81.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-11-03