FANGJIASHAN-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
QINSHAN NUCLEAR POWER COMPANY
CNNC Nuclear Operation Management Company Limited
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1012 MWe
1000 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
26 Dec, 2008
21 Oct, 2014
First Grid Connection Commercial Operation Date
04 Nov, 2014
15 Dec, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
72.86 TW.h
92.0 %
90.5 %
8.0 %
89.4 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 0.000 1000 0 0.0 100.0 100.0 0.0 NC
2015 7180.230 1012 7289 83.2 84.5 85.7 81.0 74.7
2016 7827.380 1012 7910 90.0 91.7 88.6 88.0 81.1
2017 7628.570 1012 7676 87.6 88.5 88.6 86.0 82.7
2018 8761.170 1012 8732 99.7 99.1 91.1 98.8 86.7
2019 7992.840 1012 8048 91.9 89.8 90.9 90.2 87.4
2020 7214.920 1012 7218 82.2 89.3 90.6 81.2 86.3
2021 8862.470 1012 8760 100.0 99.8 91.9 100.0 88.3
2022 8212.680 1012 8150 93.0 91.6 91.9 92.6 88.8
2023 8364.580 1012 8297 94.7 93.5 92.0 94.4 89.4
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-12-04