FANGCHENGGANG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Guangxi Fangchenggang Nuclear Power Company, Ltd.
Guangxi Fangchenggang Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
30 Jul, 2010
13 Oct, 2015
First Grid Connection Commercial Operation Date
25 Oct, 2015
01 Jan, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
61.43 TW.h
92.7 %
89.6 %
7.3 %
86.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 660.800 1000 1034
2016 7141.830 1000 7761 88.4 100.0 100.0 81.3 81.3
2017 5212.980 1000 5794 66.1 76.7 88.3 59.5 70.4
2018 7425.870 1000 7622 87.0 90.0 88.9 84.8 75.2
2019 8540.310 1000 8736 99.7 99.6 91.6 97.5 80.8
2020 7919.200 1000 8140 92.7 91.4 91.5 90.2 82.6
2021 8168.790 1000 8179 93.4 92.9 91.8 93.2 84.4
2022 8414.600 1000 8499 97.0 99.2 92.8 96.1 86.1
2023 7940.890 1000 8098 92.4 91.8 92.7 90.6 86.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18