HAIYANG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
AP-1000
China Power Investment Group
Shandong Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1170 MWe
1126 MWe
1250 MWe
3415 MWt
Construction Start Date First Criticality Date
24 Sep, 2009
08 Aug, 2018
First Grid Connection Commercial Operation Date
17 Aug, 2018
22 Oct, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
48.59 TW.h
91.7 %
91.9 %
8.3 %
89.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2018 2746.030 1170 2870 95.3 94.2 94.2 93.9 93.9
2019 9456.750 1170 8221 93.8 96.5 96.1 92.3 92.5
2020 8762.300 1170 7701 87.7 85.7 91.3 85.3 89.2
2021 9133.850 1170 8030 91.7 91.8 91.4 89.1 89.1
2022 9520.820 1170 8409 96.0 94.6 92.2 92.9 90.0
2023 8971.590 1170 7882 90.0 89.6 91.7 87.5 89.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (FUQING-6) (HAIYANG-2)  Next