Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
SHIN-HANUL-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1340
MW
e
1340
MW
e
1400
MW
e
3983
MW
t
Construction Start Date
First Criticality Date
10 Jul, 2012
22 May, 2022
First Grid Connection
Commercial Operation Date
09 Jun, 2022
N/A
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year
2020
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2022-08-19
Previous
(KORI-4)
(SHIN-HANUL-2)
Next
KOREA, REPUBLIC OF
HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-1
SHIN-KORI-2
SHIN-KORI-3
SHIN-KORI-4
SHIN-KORI-5
SHIN-KORI-6
SHIN-WOLSONG-1
SHIN-WOLSONG-2
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4