HANBIT-6

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
993 MWe
993 MWe
1053 MWe
2825 MWt
Construction Start Date First Criticality Date
20 Nov, 1997
01 Sep, 2002
First Grid Connection Commercial Operation Date
16 Sep, 2002
24 Dec, 2002

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
156.39 TW.h
84.8 %
85.5 %
15.2 %
85.1 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2002 1058.410 996 1461
2003 7652.190 950 7728 88.2 88.2 88.2 92.0 92.0
2004 6354.490 950 6449 73.4 72.8 80.5 76.2 84.0
2005 7137.130 950 7906 90.2 88.8 83.2 85.8 84.6
2006 7988.590 993 8064 92.0 91.5 85.4 91.8 86.5
2007 7859.230 993 7957 90.8 90.1 86.4 90.4 87.3
2008 7914.570 996 8073 91.9 90.9 87.1 90.5 87.8
2009 8501.440 996 8606 98.2 97.6 88.6 97.4 89.2
2010 7961.420 996 8060 92.0 91.2 89.0 91.2 89.5
2011 8090.640 996 8179 93.4 92.6 89.4 92.7 89.8
2012 7231.210 993 7325 83.4 82.7 88.7 82.9 89.1
2013 8531.740 995 8631 98.5 97.7 89.5 97.9 90.0
2014 7110.370 993 7235 82.6 81.6 88.9 81.7 89.3
2015 8006.790 993 8122 92.7 91.9 89.1 92.0 89.5
2016 7559.260 993 7667 87.3 86.5 88.9 86.7 89.3
2017 4576.120 993 4642 53.0 52.6 86.5 52.6 86.8
2018 7934.900 993 8042 91.8 91.1 86.8 91.2 87.1
2019 6367.310 993 6446 73.6 73.0 86.0 73.2 86.3
2020 8714.050 993 8784 100.0 99.7 86.7 99.9 87.0
2021 5425.440 993 5532 63.2 62.2 85.4 62.4 85.7
2022 6389.150 993 6444 73.6 73.3 84.8 73.4 85.1
2023 7360.220 993 7490 85.5 84.5 84.8 84.6 85.1
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03