SAEUL-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1418 MWe
1340 MWe
1491 MWe
3983 MWt
Construction Start Date First Criticality Date
19 Aug, 2009
08 Apr, 2019
First Grid Connection Commercial Operation Date
22 Apr, 2019
29 Aug, 2019

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
47.15 TW.h
84.1 %
84.8 %
15.9 %
83.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2019 6107.400 1418 4874 100.0 100.0 100.0 100.3 100.3
2020 9543.620 1418 6778 77.2 76.7 82.5 76.6 82.6
2021 9252.750 1418 6635 75.7 74.8 79.2 74.5 79.1
2022 9954.850 1418 7135 81.4 80.2 79.5 80.1 79.4
2023 12295.490 1418 8760 100.0 99.4 84.1 99.0 83.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18


Previous  (SAEUL-1 ) (SAEUL-3)  Next