Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
SAEUL-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1418
MW
e
1340
MW
e
1491
MW
e
3983
MW
t
Construction Start Date
First Criticality Date
19 Aug, 2009
08 Apr, 2019
First Grid Connection
Commercial Operation Date
22 Apr, 2019
29 Aug, 2019
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
47.15 TW.h
84.1 %
84.8 %
15.9 %
83.9 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2019
6107.400
1418
4874
100.0
100.0
100.0
100.3
100.3
2020
9543.620
1418
6778
77.2
76.7
82.5
76.6
82.6
2021
9252.750
1418
6635
75.7
74.8
79.2
74.5
79.1
2022
9954.850
1418
7135
81.4
80.2
79.5
80.1
79.4
2023
12295.490
1418
8760
100.0
99.4
84.1
99.0
83.9
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(SAEUL-1 )
(SAEUL-3)
Next
KOREA, REPUBLIC OF
HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SAEUL-1
SAEUL-2
SAEUL-3
SAEUL-4
SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-1
SHIN-KORI-2
SHIN-WOLSONG-1
SHIN-WOLSONG-2
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4