HANUL-5

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
998 MWe
950 MWe
1049 MWe
2825 MWt
Construction Start Date First Criticality Date
01 Oct, 1999
28 Nov, 2003
First Grid Connection Commercial Operation Date
18 Dec, 2003
29 Jul, 2004

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
150.42 TW.h
88.2 %
88.5 %
11.8 %
88.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2003 18.430 1001 188
2004 4415.650 960 4963 97.9 97.9 97.9 101.4 101.4
2005 7321.600 960 7409 84.6 83.8 88.0 87.1 91.3
2006 7882.810 994 7925 90.5 90.6 89.1 90.5 91.0
2007 8025.930 995 8115 92.6 91.9 89.9 92.1 91.3
2008 8763.820 1001 8784 100.0 99.9 92.2 99.7 93.2
2009 7924.160 1001 7988 91.2 90.8 91.9 90.4 92.7
2010 8160.250 997 8245 94.1 93.2 92.1 93.4 92.8
2011 8052.720 997 8106 92.5 92.0 92.1 92.2 92.7
2012 8773.910 998 8784 100.0 99.9 93.0 100.1 93.6
2013 7476.530 996 7544 86.1 85.4 92.2 85.7 92.8
2014 7349.720 998 7408 84.6 84.0 91.4 84.1 91.9
2015 8687.640 998 8742 99.8 99.1 92.1 99.4 92.6
2016 6877.610 998 6961 79.2 78.4 91.0 78.4 91.4
2017 6663.730 998 6707 76.6 82.3 90.4 76.2 90.3
2018 6962.420 998 7097 81.0 79.6 89.6 79.6 89.6
2019 6467.680 998 6575 75.1 74.0 88.6 74.0 88.5
2020 8750.360 998 8784 100.0 99.8 89.3 99.8 89.2
2021 7383.730 998 7478 85.4 84.5 89.0 84.5 89.0
2022 6809.010 998 6950 79.3 78.5 88.4 77.9 88.4
2023 7376.790 998 7488 85.5 84.4 88.2 84.4 88.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04