Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
SHIN-KORI-3
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1416
MW
e
1340
MW
e
1485
MW
e
3983
MW
t
Construction Start Date
First Criticality Date
16 Oct, 2008
29 Dec, 2015
First Grid Connection
Commercial Operation Date
15 Jan, 2016
20 Dec, 2016
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
21.28 TW.h
74.2 %
74.9 %
25.8 %
74.3 %
Lifetime performance calculated up to year
2018
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2016
2851.250
1383
2956
2017
12405.610
1416
8760
100.0
99.8
99.8
100.0
100.0
2018
6027.000
1416
4360
49.8
48.6
74.2
48.6
74.3
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2019-12-12
Previous
(SHIN-KORI-2)
(SHIN-KORI-4)
Next
KOREA, REPUBLIC OF
HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-1
SHIN-KORI-2
SHIN-KORI-3
SHIN-KORI-4
SHIN-KORI-5
SHIN-KORI-6
SHIN-WOLSONG-1
SHIN-WOLSONG-2
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4