HANUL-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
999 MWe
950 MWe
1052 MWe
2825 MWt
Construction Start Date First Criticality Date
01 Nov, 1993
14 Dec, 1998
First Grid Connection Commercial Operation Date
28 Dec, 1998
31 Dec, 1999

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
176.51 TW.h
80.7 %
81.9 %
19.3 %
81.5 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1998 Data from a trial operation not provided
1999 "
2000 7042.470 960 7229 82.3 81.3 81.3 83.5 83.5
2001 7732.330 960 7880 90.0 89.9 85.6 92.0 87.7
2002 7311.290 960 7448 85.0 83.8 85.0 86.9 87.5
2003 7922.450 960 8081 92.2 91.6 86.7 94.2 89.2
2004 8623.080 960 8700 99.0 98.7 89.1 102.3 91.8
2005 8003.010 960 8085 92.3 91.3 89.4 95.2 92.3
2006 7886.160 993 7938 90.6 89.8 89.5 90.7 92.1
2007 7912.850 992 7998 91.3 90.3 89.6 91.1 92.0
2008 8762.750 998 8784 100.0 100.0 90.8 100.0 92.9
2009 7924.370 998 8047 91.9 90.6 90.8 90.6 92.6
2010 8110.600 998 8149 93.0 92.6 90.9 92.8 92.7
2011 6023.710 998 6034 68.9 68.7 89.0 68.9 90.6
2012 0.000 998 0 0.0 0.0 82.1 0.0 83.5
2013 3307.100 998 3362 38.4 37.8 78.8 37.8 80.2
2014 8570.940 999 8606 98.2 97.9 80.1 97.9 81.4
2015 7322.330 999 7412 84.6 83.6 80.4 83.7 81.6
2016 5274.950 999 6298 71.7 60.1 79.1 60.1 80.3
2017 8198.680 999 8266 94.4 93.6 80.0 93.7 81.0
2018 6698.250 999 6802 77.6 76.5 79.8 76.5 80.8
2019 8344.450 999 8386 95.7 95.3 80.6 95.4 81.5
2020 7497.570 999 7548 85.9 85.4 80.8 85.4 81.7
2021 6182.870 999 6256 71.4 70.6 80.3 70.6 81.2
2022 8667.910 999 8760 100.0 99.8 81.2 99.0 82.0
2023 6109.900 999 6233 71.2 69.8 80.7 69.8 81.5
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (HANUL-3) (HANUL-5)  Next