SAEUL-4

Under Construction


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1340 MWe
1340 MWe
1400 MWe
3983 MWt
Construction Start Date First Criticality Date
20 Sep, 2018
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (SAEUL-3) (SHIN-HANUL-1)  Next