SHIN-KORI-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
996 MWe
995 MWe
1047 MWe
2825 MWt
Construction Start Date First Criticality Date
05 Jun, 2007
27 Dec, 2011
First Grid Connection Commercial Operation Date
28 Jan, 2012
20 Jul, 2012

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
85.35 TW.h
83.9 %
84.8 %
16.1 %
83.7 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2012 5400.280 997 5897 100.0 99.8 99.8 98.0 98.0
2013 3560.310 1000 3569 40.7 40.6 58.0 40.6 57.6
2014 8304.890 998 8518 97.2 96.0 73.7 95.0 73.0
2015 7405.240 996 7604 86.8 84.9 77.0 84.9 76.5
2016 6627.860 997 6718 76.5 75.7 76.7 75.7 76.3
2017 8699.480 997 8760 100.0 99.6 80.9 99.6 80.6
2018 6847.680 996 7011 80.0 78.5 80.5 78.5 80.3
2019 6889.150 996 7014 80.1 79.0 80.3 79.0 80.1
2020 8062.540 996 8127 92.5 92.1 81.7 92.2 81.5
2021 7316.900 996 7443 85.0 83.9 81.9 83.9 81.8
2022 7518.950 996 7655 87.4 86.2 82.4 86.2 82.2
2023 8715.760 996 8760 100.0 99.6 83.9 99.9 83.7
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (SHIN-KORI-1) (SHIN-WOLSONG-1)  Next