SHIN-WOLSONG-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
997
MW
e
950
MW
e
1048
MW
e
2825
MW
t
Construction Start Date
First Criticality Date
20 Nov, 2007
06 Jan, 2012
First Grid Connection
Commercial Operation Date
27 Jan, 2012
31 Jul, 2012
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
84.18 TW.h
82.8 %
83.7 %
17.2 %
82.9 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2012
4964.620
997
6256
97.0
94.9
94.9
94.9
94.9
2013
3295.840
991
3353
38.3
37.9
54.8
38.0
54.8
2014
8611.780
1000
8677
99.0
98.3
72.9
98.3
72.9
2015
6217.670
997
6354
72.5
71.2
72.4
71.2
72.4
2016
7393.370
997
7522
85.6
84.4
75.1
84.4
75.1
2017
8553.530
997
8640
98.6
97.6
79.3
97.9
79.3
2018
7002.140
997
7097
81.0
80.1
79.4
80.2
79.5
2019
7404.260
997
7511
85.7
84.7
80.1
84.8
80.2
2020
8751.100
997
8784
100.0
99.9
82.5
99.9
82.5
2021
6699.210
997
6788
77.5
76.6
81.8
76.7
81.9
2022
7892.310
997
7954
90.8
90.3
82.6
90.4
82.7
2023
7395.950
997
7483
85.4
84.6
82.8
84.7
82.9
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-12-04
Previous
(SHIN-KORI-2)
(SHIN-WOLSONG-2)
Next
KOREA, REPUBLIC OF
HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SAEUL-1
SAEUL-2
SAEUL-3
SAEUL-4
SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-1
SHIN-KORI-2
SHIN-WOLSONG-1
SHIN-WOLSONG-2
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4