SHIN-WOLSONG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
997 MWe
950 MWe
1048 MWe
2825 MWt
Construction Start Date First Criticality Date
20 Nov, 2007
06 Jan, 2012
First Grid Connection Commercial Operation Date
27 Jan, 2012
31 Jul, 2012

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
84.18 TW.h
82.8 %
83.7 %
17.2 %
82.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2012 4964.620 997 6256 97.0 94.9 94.9 94.9 94.9
2013 3295.840 991 3353 38.3 37.9 54.8 38.0 54.8
2014 8611.780 1000 8677 99.0 98.3 72.9 98.3 72.9
2015 6217.670 997 6354 72.5 71.2 72.4 71.2 72.4
2016 7393.370 997 7522 85.6 84.4 75.1 84.4 75.1
2017 8553.530 997 8640 98.6 97.6 79.3 97.9 79.3
2018 7002.140 997 7097 81.0 80.1 79.4 80.2 79.5
2019 7404.260 997 7511 85.7 84.7 80.1 84.8 80.2
2020 8751.100 997 8784 100.0 99.9 82.5 99.9 82.5
2021 6699.210 997 6788 77.5 76.6 81.8 76.7 81.9
2022 7892.310 997 7954 90.8 90.3 82.6 90.4 82.7
2023 7395.950 997 7483 85.4 84.6 82.8 84.7 82.9
Performance indicators are calculated from the Commercial Operation Date.