SHIN-HANUL-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1414 MWe
1340 MWe
1455 MWe
3983 MWt
Construction Start Date First Criticality Date
10 Jul, 2012
22 May, 2022
First Grid Connection Commercial Operation Date
09 Jun, 2022
07 Dec, 2022

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
15.41 TW.h
99.3 %
100.0 %
0.7 %
99.5 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2022 3090.990 1414 3144 100.0 100.0 100.0 100.1 100.1
2023 12319.200 1414 8760 100.0 99.3 99.3 99.5 99.5
Performance indicators are calculated from the Commercial Operation Date.