Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
SHIN-HANUL-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1414
MW
e
1340
MW
e
1455
MW
e
3983
MW
t
Construction Start Date
First Criticality Date
10 Jul, 2012
22 May, 2022
First Grid Connection
Commercial Operation Date
09 Jun, 2022
07 Dec, 2022
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
15.41 TW.h
99.3 %
100.0 %
0.7 %
99.5 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2022
3090.990
1414
3144
100.0
100.0
100.0
100.1
100.1
2023
12319.200
1414
8760
100.0
99.3
99.3
99.5
99.5
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(SAEUL-4)
(SHIN-HANUL-2)
Next
KOREA, REPUBLIC OF
HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SAEUL-1
SAEUL-2
SAEUL-3
SAEUL-4
SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-1
SHIN-KORI-2
SHIN-WOLSONG-1
SHIN-WOLSONG-2
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4